CEDA Manufactured 36” Electric Dredge on Tailings Pond

Successes

Pond Reclamation
Fort McMurray, AB

PROJECT HIGHLIGHTS

  • First oil sands tailing pond to be reclaimed
  • 7,000 manhours
  • Zero TRIF
  • Dredging, pumping and pipeline services
  • 2 - 18” dredges, 1 amphibious dredge
  • Numerous pumps from 6” to 18”
  • 2 crews, working 24/7
  • Project on-going since 2007

CLIENT VALUE

  • Adapted to challenging pond conditions
  • Project delivered on-schedule

Dredge Manufacturing — 36” Electric Power
Edmonton, AB

PROJECT HIGHLIGHTS

  • 4 units manufactured over 2.5 years
  • 36” dredges
  • 40,000 US gallons/min, nominal pumping velocity
  • Dredges can be operated remotely
  • 10,000 manhours per dredge
  • Zero TRIF

CLIENT VALUE

  • Dredges exceeded client performance requirements
  • Dredges built to aggressive timeline

2009 Tailings Dredging and Pumping Program
Fort McMurray, AB

PROJECT HIGHLIGHTS

  • Supplied 20 12X12 skid packages
    • Pumps used in various locations
  • 20,000 manhours
  • Zero TRIF
  • Design and build of pump stations and dredge
  • Piping fusion and pump system design
  • Contract to operate and maintain until 2012

CLIENT VALUE

  • Dredging exceeded client expectations
  • Project delivered on aggressive timelines

Mine Tailings Removal
Remote Mine Site, Northern Ontario

PROJECT HIGHLIGHTS

  • Removal of 100,000 cubic meters of tailings
  • 60 days of 24/7 field work
  • Zero TRIF
  • Dredging and de-watering services

CLIENT VALUE

  • Equipment exceeds performance requirements
  • Project delivered on aggressive timelines